Transit Toronto is sponsored by TransSee.ca bus tracker and next vehicle arrivals. TransSee features include vehicle tracking by route or fleet number, schedule adherence, off route vehicles and more advanced features. Works on all mobile devices and on any browser.
Supports Toronto area agencies TTC, GO trains, MiWay, YRT, HSR and GRT, as well as NY MTA, LA metro, SF MUNI, Boston MBTA, and (new) Barrie.

Buses replace subway between Pape and St. George Stations,
Before noon, August 28



This Sunday, August 28, the TTC is repairing the subway tracks beneath the Prince Edward (Bloor) Viaduct.

Before noon Sunday, trains operate along the 2 Bloor - Danforth subway line only between Kennedy and Pape Stations and between Kipling and St. George Stations.

The TTC is operating frequent, accessible shuttle buses between St. George and Pape Stations. The buses stop on Bloor Street or Danforth Avenue near all stations between Bedford Road and Pape Avenue. The buses drop off and pick up passengers at St. George and Pape Stations at the bus bays inside each station’s bus terminal.

Regular subway service resumes at noon.

The TTC previously closed this section of the subway to work on repairing the tracks under the Viaduct Sunday, June 26 and Sunday, July 10.

It will close the same section again Sunday, September 25.